亚洲欧洲日韩中文字幕,久久99精品国产自在现线小黄鸭,女教师巨大乳孔中文字幕,亚洲日韩精品欧美一区二区一

上海昱新儀器有限公司

低頻振動臺|模擬汽車運輸振動臺|跌落試驗臺|中國臺灣鹽霧試驗箱|冷熱沖擊試驗機

儀器網(wǎng)收藏該商鋪

MSN交談      小標(biāo) 您所在位置:首頁 > 技術(shù)文章 > FLTM_BI103-01(福特鹽霧標(biāo)準(zhǔn))
產(chǎn)品搜索

請輸入產(chǎn)品關(guān)鍵字:

聯(lián)系方式
地址:上海市嘉定區(qū)嘉定工業(yè)園區(qū)(地鐵11號可達)
郵編:
聯(lián)系人:丁小姐
留言:在線留言
商鋪:http://www.lcfedrb.net.cn/company_b0014053/
技術(shù)文章

FLTM_BI103-01(福特鹽霧標(biāo)準(zhǔn))

點擊次數(shù):2727 發(fā)布時間:2014-11-4

FLTM_BI103-01(福特標(biāo)準(zhǔn))

Ford laboratory Test Method(BI 103-01)

Salt Spray Resistance Test For Painted Panels and Parts

Application

This method is used to test the resistance to salt spray of painted panels and parts.

Apparatus Required
Salt Spray Cabinet
  The salt spray cabinet and operating conditions shall meet the requirements of ASTM B 117.

Scriber
    Carbide tipped.
    Source:
           Aircraft Specialties, Inc.        G.T.S.Co.
           P.O.Box 98                        12015 egraph Rd.
           Lapeer,MI 48446 U.S.A             Redford, MI 48239 U.S.A.
           (313)664-2981                     (313)531-7666
           (Model No.90 C)                   (General Scriber # CM 88)
     Panels for this test are prepared as described in FLTM BI 103-02.

                         Materials Required
Tape
     No.898(Minnesota mining & Manufacturing Co.-3M)25 mm wide. Use only the No.898 tape that is made in the U.S.A. Other No.898 tapes have different adhesion characteristics. Store in original package in a dry, dark location.
 
                        Conditioning and Test Conditions
All test values indicated herein are based on material conditioned in a controlled atmosphere of 23+/-2℃ and 50 +/-5% relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified.

Date          Action                Revisions
2001 03 13    Revised            Editorial-no technical change  A.Cockman
1990 05 11   

                        Procedure
A.   Panels
     1.Scribe two diagonal lines from corner to corner across three test panels to the bare metal. Zinc-coated steel panels should be scratched through paint to zinc coating.(Do not penetrate to the bare steel).
     2.Suspend the panels at an angle in the salt spray cabinet as specified in ASTM B 117 for the fime designated by the material specification (testing side up).
     3.Rinse the panels with water, blot dry,and examine within 15 minutes.
       Measure and report in mm the maximum corrosion and blister creepage on either side of the scribed lines. Also examine panels for occurrence of surface blisters giving size and density according to ASTM D 714. In case of zinc-coated panels, measure the maximum distance of blisters and raised paint from the scribed line.
     4.Apply tape over each scribed line, in a parallel direction, using firm finger pressure to ensure contact with the panel surface(i.e.,scribe line to be visible). This step is to be performed within 30 minutes after completion of Step 3.
     5.Within 90 +/- 30 s of application, remove the tape by pulling back rapidly (do not jerk) at as close to an angle of 180°to the panel as possible.

                       Evaluation
Report in mm, corrosion and/or blister creep and loss of adhesion after the tape test from scribed lines and occurrence of blistering and adhesion loss beyond the scribed lines.
B.    Parts
1.Wash parts in water to remove dirt and contamination.
2.Suspend the parts in the salt spray cabinet in car position for the time designated by the individual specification. Parts shall not be scribed unless otherwise requested by the applicable Engineering Specifications, and the position should be varied slightly if recesses tend to collect solution.
3.Rinse the parts with warm water and a soft sponge to remove runoff stain,blot dry and examine within 15 minutes.
4.Apply tape across the surface using firm finger pressure. this step, which is to be performed within 30 minutes after the completion of Step 3, is to help identify blistering.
5.Within 90 +/- 30 s of application, remove the tape by pulling back rapidly (do not jerk) at as close to an angle of 180°to the panel as possible.
 
                        Evaluation
Report occurrence of blistering and corrosion.

Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities.

 

[ 打印 ] [ 返回頂部 ] [ 關(guān)閉

| 商鋪首頁 | 公司檔案 | 產(chǎn)品展示 |公司動態(tài) | 詢價留言 | 聯(lián)系我們 | 會員管理 |
儀器網(wǎng) 設(shè)計制作,未經(jīng)允許翻錄必究.Copyright(C) http://www.lcfedrb.net.cn, All rights reserved.
以上信息由企業(yè)自行提供,信息內(nèi)容的真實性、準(zhǔn)確性和合法性由相關(guān)企業(yè)負責(zé),儀器網(wǎng)對此不承擔(dān)任何保證責(zé)任。
溫馨提示:為規(guī)避購買風(fēng)險,建議您在購買產(chǎn)品前務(wù)必確認供應(yīng)商資質(zhì)及產(chǎn)品質(zhì)量。
二維碼

掃一掃訪問手機站
长治市| 万山特区| 武夷山市| 太湖县| 古交市| 庆云县| 商都县| 安徽省| 离岛区| 个旧市| 平利县| 双辽市| 沙田区| 新丰县| 琼结县| 桂阳县| 胶南市| 赣榆县| 沈阳市| 西丰县| 肃南| 三明市| 克山县| 锦州市| 南川市| 从江县| 彭阳县| 随州市| 乌兰浩特市| 昔阳县| 彭泽县| 五峰| 洞口县| 合江县| 瑞安市| 通渭县| 阿拉善盟| 平舆县| 望江县| 堆龙德庆县| 玉田县|